![]() The generators can be operated in full loading under these conditions. ![]() From the results of this study, the effects of NSC could be ignored when the four out-linking circuits are in N-0, N-1, and N-2 conditions. EMTP was used to calculate the levels of NSC from the out-linking transmission circuits. To increase the economic benefit of those generators, it is required to reassess the operation limits of NSC. However, in 2010, the capacity ratio of each generator in the plant to the system peak load has been reduced to 3% only. Since Taipower is an isolated system, at the N-2 conditions, those generators were reduced to 75% loading to protect the power system.īy the way, to avoid damage of negative sequence current (NSC), the limits of the N3 power plant are stricter than those in the IEEE Standard. Each generator occupied 11% of the system peak load in 1985 when the generator was in commercial operation. ![]() TITLE: AUTHORS:, KEYWORDS:, JOURNAL NAME:, NovemABSTRACT: The N3 power plant of Taipower is located in the southern tip of Taiwan and connected to the power pool by four out-linking 345-kV overhead transmission circuits.Has been cited by the following article: See Rule Book E-7.Īrticle citations Leuven EMTP Center (LEC), “Alternative Transients Program (ATP) Rule Book,” July 1987. ATP is a version of the Electromagnetic Transients Program. Overview of the Alternative Transients Program. Acquainted with all the details and specialities of such a program.
0 Comments
Leave a Reply. |